Dredging on the port basin
Port of Skellefteå need to make a dredging to keep the draught of 8.5 meter to the inner port. The basin was latest dredged in the early 80’s and alluvion and isostasy has worked together to make this effort necessary.

The dredged material shall be used as landfill in the north port to create new land and it is also stage one i creating a new dock with a maximum draught of 15 m is possible.
The dredging and landfill is planned to be excecuted 2019 and 2020.
Project
Here you will find information about ongoing and upcoming projects at Port of Skellefteå. Do you have questions or want to know more, do not hesitate to hear from you. Contact details can be found here.

Kommunens investeringar i hamnområdet finansieras till 50 % från EU: s regionala utvecklingsfond och skapar förutsättningar för att fler typer av gods kan lassas och lossas samt att antal transporter kan öka. Även miljövinsterna blir betydande med en större och djupare hamn. Långa transporter på land, från bland annat industrier och sågverk, kan undvikas då godset istället skeppas i närområdet. Efter avslutat projekt förväntas en uppdaterad hamn som är hållbar för sin omgivning och en bra transport- och logistiklösning för regionens näringsliv.
MOORED VESSELS
ARRIVING VESSELS
Aboard BAUS
The tugboat Baus entered our business in 2012. The tugboat is modified and upgraded to fit Port of Skellefteås needs, which differs from the ship’s previous service.