Capacity

Port of Skellefteå decides on the allocation of capacity within Port of Skellefteå's yards on the south and north side of Kallholmsfjärden and Gunsen.

In collaboration with the service provider ShoreLink, a decision is made on the issue of detailed production optimization for the tracks at the Port of Skellefteå yards.

A full description of the application process can be found in the document Capacity Allocation. Opens in new window.


North port

Track

Length

Description length

Note

z100

ca 350

After vx ik6 up to stop block

Rope and stabling tracks

z104

415

Unobstructed between switches

Load track

z100

-

From vx13b (TRV) to vx ik4

Connecting track

z100

Between vx ik4 and ik5

Passage track

Rope and stabling tracks


South port

Track

Length

Description length

Note

z200

250

From vx ik1 to stop block

Load track

z201

200

From vx ik1 to stop block

Rope and stabling tracks



Hedensbyn (Hsb)

Track

Length of track

Description length

Note

z101

-

Decommissioned in 2024/2025

-

z102

-

Decommissioned in 2024/2025

-

z103

-

Decommissioned in 2024/2025

-

z104

-

Decommissioned in 2024/2025

-

z105

-

Decommissioned in 2024/2025

-

z106

-

Decommissioned in 2024/2025

-

z107

-

Decommissioned in 2024/2025

-


Gunsen (Gse)

Track

Length

Description length

Note

z102

about 600

From vx ik1 to vx ik2

Load, stowage and rope tracks

z103

about 600

From vx ik1 to vx ik2

Load, stowage and rope tracks

Active bookings

All railway yards
Railway yardValidityDaysTrain companiesFreight
Northern port2025-09-01Mon-FriGreen CargoTrailers
North harbor2025-09-01Mon-FriGreen CargoTrailers
South harbor2025-09-01Mon-FriGreen CargoTrailers
Gunsen (Gse)2025-09-01Mon-SunGreen CargoContainers
Gunsen (Gse)2025-09-01Mon-SunGreen CargoContainer


See full train schedule 2024 Pdf, 126.1 kB, opens in new window.